Funding Requirements for urgent needs at Sanyati Baptist High School
The school urgently requires solar systems for the following areas:
- Dining Hall – School losing food during Zesa outages (load requirements about 4Kw).
- Admin building – For continuation of learning during Zesa outages (approximate load 15Kw) 3. Submersible pump – for continuity of supply of water during power outages.
Fundraising committee, after talking to the school, decided to initially raise funds for the dining hall. After dining hall, funds will be raised for the admin building and then for the pump. Actual financial requirements are:
Dining Hall
The dining hall will require a 5Kva solar system as detailed below:
Qty | Description | Unit Price(US$) | Total Price (US$) |
1 | 5kVA Inverter | 750 | 750 |
1 | Lithium ion battery (48V, 100AH | 950 | 950 |
10 | 375 Monocrystalline panel | 160 | 1 600 |
Sub-total (equipment) | 3 300 | ||
1 | Mountings and accessories @30% of equipment cost (Approximate cost) | 990 | |
TOTAL | 4 290 |
Admin Building
The admin building will need three, 5Kva systems. These systems will be installed one at a time. The price of each 5Kva system is as outlined above.
Pump
The pump will require a hybrid variable speed drive with appropriate solar panels. The variable speed drive will be supplied by solar panels or the grid (alternately) to power the existing pump.
Qty | Description | Unit Price(US$) | Total Price (US$) |
1 | 2.2Kw single phase hybrid inverter
(approximate price) |
500 | 500 |
8 | 375 Monocrystalline panel | 160 | 1 280 |
Sub-total (equipment) | 1 780 | ||
1 | Mountings and accessories @30% of equipment cost (Approximate cost) | 534 | |
TOTAL | 2 314 |
Some volunteers will provide labor and expertise for all installations.
Funding Proposal
Suggest that fund raising activities are co-ordinated via cell groups. What can each cell group contribute?
Individuals can also donate